The project or ticket generator can be called up under System / CRM Settings / Project/Ticket Generator.
Please note:
1. you can configure the project here. You can define the automatic mode further down.
Please note:
2. list of all individual entries for the project. Individual entries can be added using the „New“ button.
In this window you can configure the desired individual entry/entries. Please note:
Once you have selected a project and clicked on generate, the preview appears. It looks something like this:
The icon indicates whether it is a project (folder) or a ticket (status icon). If a project or ticket should not be created (for example, holidays), you can remove the tick on the far left and the project or ticket will not be created.
Nothing is displayed under Timetable info if everything is OK, otherwise there are 3 possible indications.
To continue, click on Generate. A final window appears.
Confirm with Yes and the projects / tickets are then generated. If you select No, the process is cancelled and nothing is generated.
Generated projects can be deleted here. All associated tickets and timetable entries are then also deleted. Select the desired project and press the Delete button.
The list only contains the projects that were generated in the last seven days. After that, the generated projects no longer appear in the list.